ANALYSIS AND DESIGN OF PRODUCTION SCHEDULLING SYSTEM FOR CV. BULU NUSANTARA GRESIK

EMMY WAHYUNINGTYAS

Sari


CV. Bulu Nusantara is a company located in Gresik – East Java produces some kinds of flour as animal feed ingredients. The flours are come from chicken feathers, chicken bones, fishes and clams. The company has limited production machinery, so as to produce each kind of flour for optimum results, it must be well planned. This study is to analyze and design the information system needed by the company. The system is designed to manage inputs,processing them and resulting some informations like Master Production Schedule, dayly/weekly/monthly production report, and so on. The analysis phase produces two algorithms, each for estimating the order finishing time and schedulling calculation. The design phase produces context flow diagram, first level of data flow diagram, the conceptual and physical data model. The study result is showing us that the company needs the information system whiches consist of seven interrellated entities, eight main processes and flexible period of detailed reporting or resume reporting in form of chart

Teks Lengkap:

PDF

Referensi


Yulicia, M. 2012, Perencanaan dan Penjadwalan Produksi Botol Plastik di PT. ASTA Pramulia, Jurusan Teknik Industri Universitas Surabaya, Surabaya.

T. Morton, and D.W. Pentico, Heuristic Scheduling Systems: With Application to Production System and Project Management, John Wiley & Sons, New York, 1993

Jogiyanto, 2005, Analisis dan Desain Sistem Informasi Pendekatan Terstruktur Teori dan Praktek Aplikasi Bisnis, Yogyakarta: Andi.

Bedworth, David D and Bairley, J.E. 1987, Integrated Production Control System, John Wiley&Sons, New York

Sutalaksana,I.Z, Anggawisastra.R, dan Tjakraatmadja,J.H. 1979, Teknik Tata Cara Kerja, Jurusan Teknik Industri Teknologi Bandung, Bandung.

Yulicia, M. 2012, Perencanaan dan Penjadwalan Produksi Botol Plastik di PT. ASTA Pramulia, Jurusan Teknik Industri Universitas Surabaya, Surabaya.

T. Morton, and D.W. Pentico, Heuristic Scheduling Systems: With Application to Production System and Project Management, John Wiley & Sons, New York, 1993.

Jogiyanto, 2005, Analisis dan Desain Sistem Informasi Pendekatan Terstruktur Teori dan Praktek Aplikasi Bisnis, Yogyakarta: Andi.

Wahyudi, Eddy, 2010, Usulan Perancangan Sistem Informasi Jadwal Induk Produksi Kayu di UD Putra Dinamis Tasikmalaya, Bandung :Unikom.

Baroto, Teguh, 2002, Perencanaan dan Pengendalian Produksi, (1 sted), Jakarta, Ghalia Indonesia.

Wicaksana Pratama, Irawan Nur, 2008, Kustomisasi Rancangan Sistem Informasi Manufaktur pada Implementasi POWERMAX (Studi Kasus PT. ALSKOM POWER ENERGY SYSTEM INDONESIA), Surabaya ;ITS.


Refbacks

  • Saat ini tidak ada refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.